Robert Platt - General Contracting

Building Quality Since 1980

Navigate The Gallery

RJ Platt Photo Gallery

Project: Main Floor Remodel


Dilemma:

  • Cramped, dated, and separated LR, kitchen, and family room prevented functionality, flow and a spacious relation to the beautiful grounds outside.

Resources:

  • Extensive main floor remodel.

Implementation:

  • Removed two bearing walls and several non- bearing walls replacing them with steel and paralam beams.
  • Replaced small windows with a 15 foot 'french' door glass panel system @ the family room.
  • Completed a recessed panel maple extended kitchen featuring stone countertops, hardwood floors, and wine cabinetry.
  • Added a gas fired fireplace at the LR with a slate surround, hearth, and a maple mantle.
  • Revised the laundry room and guest bath for improved accessibility.